경기장 운영을 중단하지 않고 경기장 조명을 업그레이드하는 방법

경기장 운영을 중단하지 않고 경기장 조명을 업그레이드하는 방법

단계별 경기장 조명 개조 공사를 통해 기존 전등주, 전기 시스템, 제어 장치, 조명 방향 조정 및 시운전을 관리하면서 운영 차질을 최소화할 수 있는 방법을 알아보세요.
목차

Stadium lighting retrofits are often described as simple replacement projects.

In reality, upgrading an operating venue can be more complex than designing lighting for a new field.

The existing stadium may continue to host:

  • League matches
  • 교육
  • Concerts
  • Community events
  • Broadcast productions
  • Sponsor activities
  • The project team may only have a few nights, weekends or seasonal shutdown periods to complete the work.This makes operational continuity one of the most important design requirements.

    Why Phased Retrofit Planning Matters

  • Why Phased Retrofit Planning Matters
    Why Phased Retrofit Planning Matters
  • A phased retrofit divides the project into controlled sections rather than removing the entire existing system at once.This approach can help the venue:
    • Remain operational
    • Reduce shutdown time
    • Control capital expenditure
    • Test new equipment before full conversion
    • Coordinate work with the event calendar
    • Manage structural and electrical upgrades separately

    However, phased work also creates additional engineering challenges.

    For a period of time, the venue may operate with a mixture of:

    • Existing HID luminaires
    • New LED luminaires
    • Old and new drivers
    • Different control methods
    • Temporary circuits
    • Partially updated crossarms

    Without a clear transition plan, lighting performance and system reliability may become difficult to manage.

    Start with a Complete Site Survey

    Start with a Complete Site Survey
    Start with a Complete Site Survey

    Before selecting replacement luminaires, the project team should document the existing installation.

    The survey should include:

    • Pole coordinates
    • 폴 높이
    • Pole condition
    • Crossarm dimensions
    • Existing fixture quantity
    • Existing fixture weight
    • 유효 투영 면적
    • Cable routes
    • 회로 용량
    • 배전반
    • 제어 장비
    • Driver or ballast locations
    • 유지보수 접근 권한

    Photographs should be linked to pole and fixture identification numbers.

    This information allows the lighting, structural and electrical teams to work from the same project record.

    Existing Pole Capacity Must Be Verified

    Existing Pole Capacity Must Be Verified
    Existing Pole Capacity Must Be Verified

    LED sports luminaires may be lighter than traditional HID floodlights, but this does not automatically mean the existing structure is suitable.

    Structural assessment should consider:

    • Total fixture weight
    • 유효 투영 면적
    • Wind loading
    • 크로스암 하중
    • Bracket location
    • 중심
    • Cable and driver boxes
    • Corrosion
    • Existing structural damage

    A lighter luminaire with a larger frontal area may create greater wind loading than expected.

    The pole and crossarm should therefore be assessed as part of the full assembly.

    Do Not Select Wattage Before Reviewing Geometry

    Retrofit projects are constrained by existing pole locations.

    The lighting designer cannot freely relocate every pole to create an ideal arrangement.

    The selected optical system must work within:

    • Existing mounting height
    • Existing setback
    • Existing pole spacing
    • Available crossarm positions
    • Allowed aiming angles
    • Surrounding property boundaries

    The correct retrofit luminaire is not necessarily the highest-output model.

    A lower-weight product with multiple optical options may offer a better solution when the original pole arrangement limits aiming flexibility.

    Plan the Electrical Transition

    Plan the Electrical Transition
    Plan the Electrical Transition

    Traditional stadium lighting systems may use:

    • Remote magnetic ballasts
    • High-voltage starting circuits
    • Centralized contactors
    • Limited switching zones
    • Separate emergency circuits

    An LED retrofit may introduce:

    • Electronic drivers
    • 조명 조절
    • Digital control
    • Network gateways
    • Individual addressing
    • 서지 보호
    • Remote driver cabinets

    The electrical design should define which existing components will be:

    • Reused
    • Modified
    • Bypassed
    • Removed
    • Replaced

    Temporary operation should also be planned.

    The venue may need clearly defined procedures for switching between old and new lighting zones during construction.

    Separate Competition Lighting from Entertainment Lighting

    Where a venue introduces RGB or RGBW effects, the entertainment system should not compromise the reliability of the primary white-light system.

    The project documentation should clarify:

    • Separate power supplies
    • Separate control channels
    • Default white-light state
    • Communication failure behavior
    • 로컬 수동 제어
    • Emergency operating mode

    The competition lighting must remain available even if the entertainment controller, network or show programming is unavailable.

    Commission Each Phase Independently

    Every completed phase should be treated as a temporary but operational lighting system.

    The project team should verify:

    • Fixture installation
    • Mechanical locking
    • Electrical connections
    • 드라이버 구성
    • Control addresses
    • Initial aiming
    • Operating modes
    • Emergency behavior
    • Field illuminance
    • Visual consistency with remaining fixtures

    Any changes should be recorded immediately.

    Waiting until the final phase to update drawings and aiming records creates unnecessary risk.

    Maintain a Living As-Built Record

    Maintain a Living As-Built Record
    Maintain a Living As-Built Record

    A phased retrofit may continue for months or years.

    The project therefore needs a continuously updated digital record containing:

    • Pole IDs
    • Luminaire IDs
    • Product model
    • 광 분배
    • Power setting
    • Driver location
    • Circuit number
    • Control address
    • 조준 각도
    • Installation date
    • Commissioning status

    This information supports both project completion and future maintenance.

    A Successful Retrofit Protects Venue Operations

    The best retrofit is not simply the one that replaces the old luminaires fastest.

    A successful project should:

    • Preserve safe venue operation
    • Reduce disruption
    • Maintain lighting performance during transition
    • Control structural and electrical risk
    • Provide traceable installation data
    • Support future maintenance

    For operating stadiums, project planning is part of the lighting solution.

    자주 묻는 질문

    Yes, but the project normally requires phased construction, temporary operating procedures and independent commissioning of each completed section.

    Can existing stadium poles always be reused?

    No. Pole and crossarm capacity must be reviewed based on weight, wind loading, effective projected area, corrosion and mounting configuration.

견적 요청하기

여러분의 프로젝트에 대해 소개해 주세요

가장 신속하게 견적을 받으시려면 모델명, 수량, 용도 및 설치 높이를 기재해 주십시오.

신뢰 및 개인정보 보호

당사는 귀하의 개인정보를 존중합니다. 귀하의 정보는 문의 사항에 답변하는 용도로만 사용됩니다.

프로젝트 사양서, 레이아웃 또는 도면을 업로드하세요.

감사합니다!

문의 내용이 정상적으로 전송되었습니다.
24시간 이내에 답변해 드리겠습니다.